Weathertight protection, not a loose cover
A scaffold-supported roof system is tied and fixed to stay weathertight through wind and rain, rather than relying on loose tarpaulin that can shift or fail.
Temporary roof systems
A properly built temporary roof keeps weather out of the building and keeps roofers working, whatever the forecast does mid-project.
Free site survey. Written quote back within one day.
CISRS-carded
Every scaffolder trained and card-checked
£10m insurance
Public and employers' liability cover
Fast response
Day or night for storm and weather emergencies
Weekly inspections
Recorded and handed over with scaff tags
The Thompsons Towers standard
Every scaffolder trained, carded and checked before they set foot on your property.
Full cover in place on every domestic and commercial job we take on.
We survey at no charge and send an itemised written quote back within one day.
Six weeks of hire as standard, with weekly inspections throughout.
The service
Once a roof is stripped, the building underneath is exposed to whatever the weather does next, and Kent's weather doesn't wait for a convenient gap in the programme. A temporary roof system, a scaffold-supported cover over the open roof; keeps rain, wind and debris out while roofers, carpenters or restoration teams work underneath.
We build these as a proper independent scaffold structure with a supported sheeted or tarpaulin roof over the top, rather than a loose cover draped over exposed timbers. That means it can be trusted to stay put through wind and rain rather than needing constant attention.
Temporary roofs are used for planned re-roofing projects, but they're just as often needed urgently after storm damage, a fallen tree or a fire that's left a roof open. We answer the phone out of hours and aim for a fast response, day or night, when a building needs covering before more damage is done.
Because a temporary roof is protecting the building rather than just providing access, the structure and covering are inspected weekly through the hire period, checking fixings, sheeting and drainage are still doing their job as conditions change.
Whether it's a full re-roof on a detached house or an emergency cover over storm damage on a commercial unit, Mason designs the temporary roof to suit the building's shape, pitch and the length of time it needs to stay up.
Homeowners and contractors re-roofing a property, landlords and businesses dealing with storm or fire damage, and anyone needing a roof kept weathertight during works.
Full re-roofs, roof structure repairs, chimney work exposing the roof space, storm or fire damage, or any project where the roof covering is off for more than a day or two.
A properly engineered temporary roof, tied into a supporting scaffold, withstands wind and rain reliably, a loose tarpaulin over exposed timbers doesn't, and can fail at exactly the wrong moment.
What it costs to wait
An exposed roof is one of the fastest ways for a property to suffer serious water damage, and improvised covers often fail at the moment they're needed most; in high wind or heavy rain.
Rain getting into an open roof space can damage ceilings, insulation, wiring and stored contents within hours, turning a roofing job into a much larger repair bill.
Loose sheeting not properly tied into a scaffold structure can lift, tear or blow off in strong wind, leaving the roof exposed exactly when the weather is at its worst.
Without reliable weather protection, roofers lose working days to rain and wind, and any water ingress that does occur can mean drying out and repair work before roofing can even resume.
Our process
Mason assesses the roof shape, pitch, access and the likely duration of the works to size the temporary roof correctly.
Katie provides a clear written quote covering the scaffold and roof covering, back to you within one working day; faster where storm damage means urgency.
Risk assessments and method statements are prepared, with design calculations produced for larger or non-standard roof spans at extra charge.
The supporting scaffold is built first, then the roof covering is fitted and tied in securely, sized to shed water away from the building.
The structure and covering are checked weekly through the hire period, then struck once the permanent roof covering is complete.
What you get
A scaffold-supported roof system is tied and fixed to stay weathertight through wind and rain, rather than relying on loose tarpaulin that can shift or fail.
We answer the phone out of hours and aim for a fast response, day or night, when a roof needs covering urgently to stop further damage.
All scaffolders hold CISRS cards and CITB training, so the supporting structure is erected to a consistent, checked standard even under time pressure.
The system is designed for the expected duration of the roofing works, with weekly inspections keeping it sound if the programme runs on.
We beat any genuine written scaffolding quote, and Katie gets a written quote back to you within a day so decisions about weather protection aren't delayed.
Every temporary roof is guaranteed secure, safe and fit for its intended purpose, giving you and any insurer confidence the property is properly protected.
In detail
A temporary roof has to do two jobs at once; keep the building dry and give roofers safe access above the exposed structure; which shapes how it's designed and materials chosen.
The supporting structure is standard steel tube and fitting or system scaffold, built to take the loading of the roof covering plus wind pressure. The covering itself is heavy-duty sheeting or reinforced tarpaulin, fixed with battens and ties rather than left loose, so it holds its shape and position in wind.
Drainage detailing matters as much as the covering; the roof pitch is designed to shed water away from the building and off the scaffold, with gutters or channels added where a large volume of run-off is expected.
The supporting scaffold goes up first, built to the shape and pitch needed to keep the covering taut and self-shedding rather than pooling water. The covering is then fixed section by section, with overlaps and ties checked before roofers are given access underneath.
For emergency covers after storm or fire damage, the same principles apply but the sequence is compressed: Mason prioritises getting a secure, weathertight structure up quickly, then refines detailing such as drainage once the immediate risk to the building is addressed.
Full temporary roofs span the whole roof area for a complete re-roof, while partial systems cover just the section being worked on; common where a chimney or dormer repair only exposes part of the roof. Both are sized to the actual scope rather than defaulting to a full cover.
Larger or unusually shaped roofs, such as those with multiple pitches or dormers, may need design drawings and calculations to confirm the structure can safely span the area, produced at an additional charge.
Planned re-roofing projects on homes and commercial buildings, storm damage that's stripped tiles or slates, fire damage exposing the roof structure, and chimney or structural repairs that require the roof to be opened up all call for a temporary roof.
It's also used where a re-roof is being carried out in phases over a longer commercial building, keeping each completed section covered until the whole roof is finished.
On homes, the priority is usually protecting the loft space, insulation and ceilings below, with the scaffold and covering sized to a single roof footprint and access planned around the household's daily use of the property.
Commercial temporary roofs often need to span larger, flatter or more complex roof areas, sometimes over an occupied building below, which brings in additional considerations around public safety at ground level, business continuity and phased sequencing across a bigger roof area.
Common questions
Still unsure? Ring 07355 037000 and speak to Katie or Mason directly.
Cost depends on the roof size, pitch complexity and how long the cover needs to stay up. A free site survey lets us give an accurate written quote within a day, and we'll beat any genuine written quote you've already had.
We answer the phone out of hours and aim for a fast response, day or night, for storm and weather emergencies, prioritising getting a secure weathertight structure up before refining the finer detailing.
A free site survey lets Mason assess the roof and size the system correctly, then Katie sends a written quote within a day. RAMS are prepared before the supporting scaffold and covering go up.
Every scaffold and covering we install is guaranteed secure, safe and fit for its intended purpose, and is backed by £10 million public liability and £10 million employers' liability insurance.
A six-week hire period is included as standard, which suits most re-roofing programmes. Weekly inspections keep the structure and covering sound if the works run longer, with any extension agreed honestly.
You'll receive RAMS before installation, plus scaff tags and weekly inspection records throughout the hire, handed over at completion. Design drawings and calculations are available for larger spans at extra charge.
Yes; partial covers are common where only a section is being worked on, such as a chimney repair or dormer replacement, and are sized to the actual area of exposed roof rather than the whole building.
Yes, across Tonbridge, Tunbridge Wells, Hadlow, Kings Hill, Paddock Wood, Maidstone, Sevenoaks, Ashford, Canterbury, Dartford, Gravesend and into London, covering Kent, Sussex and London.
See every service on the scaffolding services overview or read more about Thompsons Towers.
Postcode not listed? Check our coverage or ring the office.
Free survey · Quote in one day
Call 07355 037000 for a fast response, day or night, or book a free site survey for planned re-roofing work.
Phone answered out of hours for emergencies.